Shift Report
Static P11 report layout for Madusari KIMBO Sausage Line. Report values are calculated, read-only, and prepared for sign-off or print output.
Read-Only Report Values
End-of-shift summary generated from static dummy values. All calculated values are locked and read-only.
Print/export toolbar for the static Shift Report. Export PDF is intentionally disabled until integration is available.
Production · Manufacturing Operations
Shift Report
Sausage Line 01 · Shift B · 14:00 - 22:00
Report No
SR-2026-0501-B-SL01
01 May 2026 · 22:08 WIB
Draft / Pending Sign-OffReport Identity
Shift report identity and locked production context
- Report No
- SR-2026-0501-B-SL01
- Plant
- PT Madusari Nusaperdana
- Line
- Sausage Line 01
- Shift
- Shift B
- Date
- 01 May 2026
- Work Order No
- WO-2026-0501-001
- SKU
- KIMBO Sosis Sapi 10 pcs
- Batch
- BATCH-SG-0501-01
- Report Status
- Draft / Pending Sign-Off
Top Loss Summary
Recommended Investigation: Inspect film roll tension and sealing alignment every 2 hours.
Shift Time Summary
Shift Duration
480 min
Planned Downtime
50 min
Planned Production Time
430 min
Unplanned Downtime
40 min
Operating Time
390 min
Planned downtime is displayed as planning context only and is not treated as Availability loss in this report.
Production Summary
Target Qty
48,000 pack
Total Count
42,120 pack
Good Count FPQ
40,320 pack
Reject Count
1,800 pack
Rework Pass
450 pack
Final Yield
40,770 pack
Attainment
87.8%
OEE KPI Summary
OEE
78.2
%OEE = Availability x Performance x FPQ.
Read-only calculated report value
Availability
90.7
%Operating Time 390 min / Planned Production Time 430 min.
Availability excludes planned downtime registered before shift start
Performance
90.0
%42,120 actual count against 46,800 ideal output.
Driven by speed loss and minor stops
FPQ
95.7
%Final Yield is reported separately and does not improve FPQ.
Rework Pass excluded from FPQ
Downtime Summary
| Reason | Machine | Duration | Impact |
|---|---|---|---|
| Film Jam | Packaging Machine 01 | 30 min | Availability Loss |
| Waiting Material | Stuffer | 10 min | Availability Loss |
Attainment Trend
Quality Summary
| Defect | Quantity | Classification | Status | Effect |
|---|---|---|---|---|
| Seal Leak | 1,200 pack | Reject / Scrap | Affects FPQ | Affects FPQ |
| Underweight | 600 pack | Reject / Scrap | Affects FPQ | Affects FPQ |
| Seal Leak | 450 pack | Reworkable | Rework Pass | Final Yield Only |
Rework Pass is shown for Final Yield tracking only and must not be treated as FPQ improvement. Final Yield remains separate from FPQ in this report.
Sign-Off Section
Prepared By
System Generated
Reviewed By
Supervisor
Approved By
Production Manager
Sign-Off Status
Pending