Downtime

BS

Downtime Management

Static Demo
Live shift
SHIFT-2026-0501-B

Shift B / Sausage Line 01 / WO-2026-0501-001 · 01 May 2026

Export and advanced filter tools available after integration.

Shift / Work Order Context

PT Madusari Nusaperdana · SHIFT-2026-0501-B

In Progress
Work Order No
WO-2026-0501-001
Line
Sausage Line 01
Shift
Shift B
SKU
KIMBO Sosis Sapi 10 pcs
Batch
BATCH-SG-0501-01
Shift Time
14:00-22:00
Status
In Progress

Total Downtime

40

min
Against PPT40 / 430 min

Unplanned + emergency this shift

Active Downtime

0

Sausage Line 01 is running

No active downtime now

Reason Pending

1

Before shift sign-off

Emergency reason must be completed

Availability Loss

9.3

%

Planned Downtime: 50 min

Loss from downtime events

Top Reason

Film Jam

Highest availability loss

Packaging Machine 01

Reason Pending — Emergency downtime requires reason code before shift sign-off.

DT-003 on Packaging Machine 01 is blocked until the reason code is filled.

Shift filter active:Shift BSausage Line 01

Downtime Event Log

3 events in the selected shift. Click a row to open the drawer.

Shift scope only
EventTimeDurationMachineReasonClassificationImpactStatusRecorded ByAction
DT-001
FILM_JAM
15:4216:12
01 May 2026
30 min
Packaging Machine 01
MAC-05
Film Jam
Film folded at feeder; line stopped and packaging lane was cleared.
UnplannedAvailability Loss
Closed
Agus Priyanto
Closed by Budi Santoso
DT-002
WAITING_MATERIAL
18:3518:45
01 May 2026
10 min
Stuffer
MAC-02
Waiting Material
Casing replenishment arrived late from staging area.
UnplannedAvailability Loss
Closed
Agus Priyanto
Closed by Budi Santoso
DT-003
EMERGENCY_TRIGGER
19:20
01 May 2026
Emergency
Packaging Machine 01
MAC-05
Reason Pending
Emergency stop was triggered. Reason code must be completed before shift sign-off.
EmergencyAvailability Loss
Reason Pending
Agus Priyanto
Awaiting supervisor
Showing 3 eventsStatic demo data · No save action connected