Loss Analysis

BS

Loss Analysis

Static P10 deep-dive for Madusari KIMBO manufacturing lines. The page explains OEE loss sources without duplicating the shared app shell.

Static DemoShift BAll Active LinesTop loss: Film Jam

Business Rule Guardrail

Static deep-dive view for Madusari KIMBO sausage and nugget lines. Availability excludes planned downtime registered before shift start.

Plant / Shift Context

Current manufacturing scope for P10 loss analysis

OEE Loss Breakdown
Plant
PT Madusari Nusaperdana
Date
01 May 2026
Shift
Shift B
Scope
All Active Lines
Main Focus
OEE Loss Breakdown

Filter Bar

Total OEE Loss

18.4

%

Static P10 summary for Shift B on Madusari active lines.

Current combined loss pressure across active lines

Availability Loss

9.3

%

Planned downtime registered before shift start is excluded from Availability loss.

Unplanned and emergency downtime only

Performance Loss

10.0

%

Performance loss is linked to line speed below ideal and minor stop behavior.

Speed loss and minor stops

FPQ Loss

4.3

%

Rework Pass is excluded from FPQ and Final Yield remains a separate measure.

Reject / scrap and unresolved hold

Top Loss Driver

Film Jam

Largest single contributor in the shift across all active lines.

Sausage Line 01 · Packaging Machine 01

Loss Contribution

Availability from downtime, Performance from speed loss, and FPQ from reject or hold events

Availability Loss

Loss from downtime on Film Jam and Waiting Material events.

Loss

9.3%

share of current OEE loss view

Linked only to unplanned or emergency downtime. Planned downtime registered before shift start must not appear here.

Performance Loss

Loss from speed loss and minor stops versus configured ideal speed.

Loss

10.0%

share of current OEE loss view

Linked to reduced speed and minor stops. Current top case is Sausage Line 02 running 108 vs 120 pack/min.

FPQ Loss

Loss from reject / scrap events and unresolved quality hold.

Loss

4.3%

share of current OEE loss view

Rework Pass must not be treated as FPQ improvement. Final Yield stays separate from FPQ.

Component loss cards explain the three OEE dimensions. They are presented as diagnostic views and should not be summed directly into the total OEE loss card.

Pareto / Top Loss

Highest individual loss drivers across Sausage and Nugget lines for Shift B

Top 5
1

Film Jam

Availability
Sausage Line 0130 min
Impact-9.3%
30 min

Cumulative 37%

2

Waiting Material

Availability
Nugget Line 0118 min
Impact-5.5%
18 min

Cumulative 59%

3

Speed Loss

Performance
Sausage Line 02108 vs 120 pack/min
Impact-3.8%
108 vs 120 pack/min

Cumulative 74%

4

Seal Leak

FPQ
Sausage Line 011,200 pack
Impact-4.3%
1,200 pack

Cumulative 92%

5

Underweight

FPQ
Sausage Line 01600 pack
Impact-2.1%
600 pack

Cumulative 100%

Loss Breakdown Table

Ranked loss list with recommended investigation and drill-through action

RankLossLineComponentDuration / QuantityImpactRecommended InvestigationAction
1

Film Jam

Sausage Line 01Availability30 min-9.3%Inspect film roll tension, sealing alignment, and nip roller wear on Packaging Machine 01.View Downtime Events
2

Waiting Material

Nugget Line 01Availability18 min-5.5%Check raw material buffer timing and confirm kitting handoff before depletion on Nugget Line 01.View Downtime Events
3

Speed Loss

Sausage Line 02Performance108 vs 120 pack/min-3.8%Validate ideal speed setup, feeder stability, and minor stop pattern before adjusting target throughput.View Sausage Line 01 detail
4

Seal Leak

Sausage Line 01FPQ1,200 pack-4.3%Review sealing temperature window, jaw alignment, and reject segregation for the affected batch.View Quality Events
5

Underweight

Sausage Line 01FPQ600 pack-2.1%Calibrate filling weight control and confirm checkweigher trend before the next production block.View Quality Events

Recommended Investigation

Top-priority action based on the current loss hierarchy

Top loss is Film Jam on Packaging Machine 01.

Availability loss remains the strongest OEE drag in Shift B because the event was recorded as unplanned downtime during planned production time.

Recommended action: inspect film roll tension and sealing alignment every 2 hours.

Availability loss is linked to unplanned or emergency downtime only.

Performance loss is linked to speed loss or minor stops.

FPQ loss is linked to reject / scrap and unresolved hold.

Rework Pass is excluded from FPQ and Final Yield remains separate.