Shift Planning

BS

Shift PlanningWO-2026-0501-001

Shift Configured

P04 · Planning / Shift Setup

Configure shift schedule for the selected Work Order and show PPT calculation.

Work Order Context

Selected production order and shift setup context for the PPT calculation.

Shift B

Work Order

WO-2026-0501-001

Line

Sausage Line 01

SKU

KIMBO Sosis Sapi 10 pcs

Shift

Shift B

Batch

BATCH-SG-0501-01

Ideal Speed

120 pack/min

Target Qty

48,000 pack

Shift Configuration

Configure the active shift window for the selected Work Order.

Static Demo / Simulation Demo

Auto-calculated from Start Time and End Time.

Static Demo

Save Shift is visual only in this slice. Duration and PPT values are derived automatically from the approved demo schedule and planned downtime totals.

Cancel / Back
PPT Summary

Planned Production Time output for the current Work Order shift setup.

PPT Highlight

Shift Duration

480 minutes

Planned DT

50 minutes

PPT

430 minutes

Planned Production Time
430minutes

430 min × 120 pack/min = 51,600 pack

Target Output Reference

430 min × 120 pack/min = 51,600 pack

WO Target

48,000 pack

Ideal Speed

120 pack/min

Planned Downtime Breakdown

Line Clearance

14:00-14:10

10 min

Break

17:00-17:30

30 min

Scheduled Cleaning

20:00-20:10

10 min

Static Demo / Simulation Demo

Save Shift and Add Planned Downtime stay on static demo routes only.

Shift configuration locked — Production in progress.

Displayed as a static lock state only. No realtime status or mutation is connected.

Business Rules
  • Duration is auto-calculated from Start Time and End Time.
  • PPT = Shift Duration − Planned Downtime.
  • Planned downtime registered before shift start does not reduce Availability.
  • Target Output is theoretical: PPT × Ideal Speed.
  • WO Target remains separate from the theoretical target output.

Navigation