Shift Planning — WO-2026-0501-001
Shift ConfiguredP04 · Planning / Shift Setup
Configure shift schedule for the selected Work Order and show PPT calculation.
Selected production order and shift setup context for the PPT calculation.
Work Order
WO-2026-0501-001
Line
Sausage Line 01
SKU
KIMBO Sosis Sapi 10 pcs
Shift
Shift B
Batch
BATCH-SG-0501-01
Ideal Speed
120 pack/min
Target Qty
48,000 pack
Configure the active shift window for the selected Work Order.
Auto-calculated from Start Time and End Time.
Static Demo
Save Shift is visual only in this slice. Duration and PPT values are derived automatically from the approved demo schedule and planned downtime totals.
Planned Production Time output for the current Work Order shift setup.
Shift Duration
480 minutes
Planned DT
50 minutes
PPT
430 minutes
430 min × 120 pack/min = 51,600 pack
Target Output Reference
430 min × 120 pack/min = 51,600 pack
WO Target
48,000 pack
Ideal Speed
120 pack/min
Planned Downtime Breakdown
Line Clearance
14:00-14:10
Break
17:00-17:30
Scheduled Cleaning
20:00-20:10
Static Demo / Simulation Demo
Save Shift and Add Planned Downtime stay on static demo routes only.
Shift configuration locked — Production in progress.
Displayed as a static lock state only. No realtime status or mutation is connected.
- Duration is auto-calculated from Start Time and End Time.
- PPT = Shift Duration − Planned Downtime.
- Planned downtime registered before shift start does not reduce Availability.
- Target Output is theoretical: PPT × Ideal Speed.
- WO Target remains separate from the theoretical target output.