SAUSAGE LINE 02 | Shift B | 14:00-22:00 | 01 May 2026

LIVE
Updated 18s ago
Static DemoOEE 78.2%Top loss: Film JamCurrent shift
DT EventsQC Events
Loss analysis page available after integration.

Line / Shift Context

PT Madusari Nusaperdana · SAUSAGE-LINE-02

In Progress
Plant
PT Madusari Nusaperdana
Line
Sausage Line 01
Shift
Shift B
Date
01 May 2026
Work Order No
WO-2026-0501-001
SKU
KIMBO Sosis Sapi 10 pcs
Batch
BATCH-SG-0501-01
Status
In Progress

OEE

78.2%
-1.8% vs 80% target

Availability

90.7%
40 min unplanned downtime

Performance

90.0%
108 pack/min vs 120 ideal

First Pass Quality

95.7%
1,800 rejected packs

Component Breakdown

Breaks down which OEE component contributes the biggest loss in the current shift

Availability

90.7%

Availability is impacted by Film Jam and Waiting Material events.

Loss from 40 min unplanned downtime

Performance

90.0%

Line is running 12 pack/min below ideal speed.

Actual speed 108 pack/min vs ideal speed 120 pack/min

FPQ

95.7%

Rework Pass is excluded from FPQ and contributes to Final Yield only.

Impacted by 1,800 rejected packs

OEE Formula

OEE = Availability x Performance x FPQ

90.7% x 90.0% x 95.7% = 78.2%. These values are calculated and not editable.

OEE Trend

Current shift trend for OEE, Availability, Performance, and FPQ

Static demo trend

Loss Contribution

Shows which OEE component creates the highest loss pressure

Availability Loss

40 min unplanned downtime

9.3%

Performance Loss

Actual speed below ideal

10.0%

FPQ Loss

1,800 rejected packs

4.3%

Top Loss Driver: Availability Loss

Film Jam on Packaging Machine 01 is the largest contributor at 9.3% impact.

Downtime Impact

Explains the main Availability loss events in the shift

Planned DT

50 min

Unplanned DT

40 min

Operating Time

390 min

Availability Impact

-9.3%

Film Jam · Packaging Machine 01

15:42 · 30 min · Unplanned

Availability Loss

Waiting Material · Stuffer

18:35 · 10 min · Unplanned

Availability Loss
Open Downtime Demo

Quality Impact

Explains the FPQ loss contributors in the shift

Total Count

42,120 pack

Reject Count

1,800 pack

Good Count FPQ

40,320 pack

Final Yield

40,770 pack

Seal Leak · 1,200 pack

16:25 · Reject / Scrap · Logged

Affects FPQ

Underweight · 600 pack

17:40 · Reject / Scrap · Logged

Affects FPQ

Seal Leak · 450 pack

18:15 · Reworkable · Rework Pass

Final Yield Only
Open Quality Demo

Speed Loss

Explains the current Performance gap against ideal speed

Ideal Speed120 pack/min
Current Speed108 pack/min
Average Speed108 pack/min
Ideal Output46,800 pack
Total Count42,120 pack
Performance90.0%
Performance Loss10.0%

Formula

Performance = Total Count / (Operating Time x Ideal Speed) x 100

42,120 / (390 x 120) x 100 = 90.0%

Line is running 12 pack/min below ideal speed.

Event Timeline

Major events that changed OEE during Shift B

Shift Started

14:00 · Baseline

OEE After

84.0%

Film Jam Started

15:42 · Availability

OEE After

81.3%

Film Jam Closed

16:12 · Availability

OEE After

79.8%

Seal Leak Reject Logged

16:25 · FPQ

OEE After

78.9%

Underweight Reject Logged

17:40 · FPQ

OEE After

78.2%

Recommended Investigation

Turns the current analytics result into the next action

Investigate Film Jam on Packaging Machine 01.

This is the top Availability loss contributor for Shift B.

Recommended action: inspect film roll tension and sealing alignment every 2 hours.

Recommendation workflow available after integration.
Top machine: Packaging Machine 01