OEE Command Center

BS
Plant ScopeStatic DemoLiveUpdated 17:00

Plant Performance Command Center

Executive OEE view for all active Madusari production lines during the current shift, with immediate visibility into risk, line health, and pending action follow up.

Plant

PT Madusari Nusaperdana

Date

01 May 2026

Shift

Shift B

Scope

All Active Lines

Last Update

17:00

Mode

Live

Attention Required

Sausage Line 01 OEE is 78.2%, below the 85% target. Top loss: Film Jam on Packaging Machine 01.

Plant OEE

81.6

%

Weighted plant OEE is below the 85% target.

Largest drag comes from Sausage Line 01 availability loss.

Active Lines

4

All active lines are reporting in the current shift.

4 lines included in the live plant snapshot.

Lines Below Target

2

Sausage Line 01 and Nugget Line 01 are under target.

Management attention is needed before the next shift handover.

Plant Attainment

89.4

%

Actual output versus current shift target.

Attainment is constrained by downtime and speed loss.

Total Downtime

92

min

Combined downtime across all active lines for Shift B.

Availability loss is still the dominant plant risk.

Open Actions

6

Improvement actions still open across production and CI.

2 overdue and 3 due today need follow-through.

Plant OEE Trend

Current shift trend for Plant OEE, Availability, Performance, and FPQ.

Loading plant trend...

Cross-Line OEE Comparison

Current shift OEE and component comparison across all active lines.

Sausage Line 01

WO-2026-0501-001

78.2%

Availability

90.7%

Performance

90.0%

FPQ

95.7%

OEE vs 100%Film Jam is the current top loss
WarningView Line

Sausage Line 02

WO-2026-0501-002

86.4%

Availability

94.0%

Performance

96.2%

FPQ

95.3%

OEE vs 100%Minor Speed Loss is the current top loss
RunningView Line

Nugget Line 01

WO-2026-0501-003

82.7%

Availability

91.5%

Performance

94.0%

FPQ

96.1%

OEE vs 100%Waiting Material is the current top loss
WarningView Line

Nugget Line 02

WO-2026-0501-004

89.1%

Availability

96.0%

Performance

96.8%

FPQ

95.9%

OEE vs 100%No Major Loss is the current top loss
RunningView Line

Line Status Table

Live plant snapshot per active line with direct drilldown to line-level OEE detail.

Sorting and filter tools available after integration.
LineWork OrderSKUShiftOEEAvailabilityPerformanceFPQStatusTop LossLast UpdateAction
Sausage Line 01WO-2026-0501-001KIMBO Sosis Sapi 10 pcsShift B78.2%90.7%90.0%95.7%WarningFilm Jam17:00View Line
Sausage Line 02WO-2026-0501-002KIMBO Sosis Ayam 10 pcsShift B86.4%94.0%96.2%95.3%RunningMinor Speed Loss17:00View Line
Nugget Line 01WO-2026-0501-003KIMBO Chicken Nugget 500gShift B82.7%91.5%94.0%96.1%WarningWaiting Material17:00View Line
Nugget Line 02WO-2026-0501-004KIMBO Nugget Stick 250gShift B89.1%96.0%96.8%95.9%RunningNo Major Loss17:00View Line

Top Loss / Risk Summary

Current plant-level loss ranking to guide management investigation priorities.

1

Film Jam

Availability
Sausage Line 01Impact -9.3%

Inspect film roll tension

Investigate
2

Waiting Material

Availability
Nugget Line 01Impact -5.5%

Check material staging

Investigate
3

Speed Loss

Performance
Sausage Line 02Impact -3.8%

Check machine speed setting

Investigate
4

Seal Leak

FPQ
Sausage Line 01Impact -4.3%

Check sealing temperature

Investigate

Pending Action Summary

Outstanding improvement work that still needs plant-level follow-up.

Open Actions

6

Overdue Actions

2

Due Today

3

Completed This Week

8

Inspect film roll tension

Sausage Line 01

Due TodayHigh

Review material staging

Nugget Line 01

OverdueHigh

Check sealing jaw temperature

Sausage Line 01

OpenMedium

Management Insight

Below Target

Plant OEE is 81.6%, below the 85% target. The largest contributor is Availability Loss from Sausage Line 01, mainly caused by Film Jam on Packaging Machine 01. Prioritize downtime investigation before the next shift.

Prioritize downtime investigation before shift handover.Recheck film roll tension and sealing alignment.
Open Line Detail